Camp_Rudder_008

Project Description

Customer:

The Green Simmons Company, Inc.

Project/Contract Value:

$324,046

CCI Company:

CCI Mechanical, LLC

As a subcontractor to The Green Simmons Company, Inc., CCI Mechanical, LLC performed plumbing and HVAC services as part of the Bldg. 6009 renovation.  CCI-M’s plumbing scope included demolition of existing plumbing fixtures, plumbing equipment, water piping, waste and vent piping, and insulation, plus installation of new plumbing fixtures and equipment, water piping, waste and vent piping, and insulation.  CCI-M’s HVAC / mechanical scope included demolition of existing HVAC equipment, ductwork, hydronic piping, air distribution equipment, and insulation; installation of new chilled water system including a new 52 ton air cooled chiller, chilled water pump, air control, chemical treatment system, chilled water buffer tank, underground and above-grade piping and insulation; installation of new air distribution system, including two new 10 horsepower medium-pressure air handlers, 10 new variable volume air terminal units, medium and low pressure duct systems, and new air devices; installation of a new direct digital controls (DDC) system; and installation of a new ductless heat pump system serving critical communication equipment areas.